Factors:- Pre Engineered Buildings VS Conventional Metal Buildings. 1) Design: - Design Portion of Pre Engineered Building if quick and efficient. It design by computer program for most exact measurement of material required. It calculate the point load. In Conventional Building it design from ground up and takes more time. 2) Delivery Speed:- Due to quick design and fast production it will delivers in 4-8 week and in conventional it takes 8-10 week. 3) Cost: - As in PEB cost is 30% less as compare to Conventional buildings. We are the leading manufacturer of Pre Engineered Building & Eot Crane.